Outfall drain design, Kyabram

  • Project typeStormwater & flood control
  • Project value$47,000
  • Completion Date30 June 2021
Kyabram South Boundary Road

Council, in consultation with a number of stakeholders, will review an existing design for the renewal of open stormwater drainage system through Kyabram Golf Course and along a section of South Boundary Road to Lake Road, Kyabram.

The scope of works includes:

  • vegetation removal
  • removal of culvert crossings including end-walls
  • supply and installation of new culvert crossings and end-walls
  • cleaning, re-shaping and regrading of the existing earth drain
  • connection of the South Boundary Road table drain to the existing earth drain
  • rock beaching.

This stage will be design only and will include investigation and renewal of the existing drainage assets for construction in future years (not budgeted).